{"id":443,"date":"2026-10-31T12:00:00","date_gmt":"2026-10-31T12:00:00","guid":{"rendered":"https:\/\/www.busductfactory.com\/bus-duct-maintenance-checklist\/"},"modified":"2026-10-31T13:52:29","modified_gmt":"2026-10-31T13:52:29","slug":"bus-duct-maintenance-checklist","status":"publish","type":"post","link":"https:\/\/www.busductfactory.com\/vi\/bus-duct-maintenance-checklist\/","title":{"rendered":"Bus Duct Maintenance: The 8-Point Annual Checklist"},"content":{"rendered":"<p>A bus duct system is designed to run for decades with very little attention. That is exactly why it fails quietly. Unlike cable, whose degradation usually shows up as a tripped breaker, busway degradation shows up as heat at a joint you never look at \u2014 and heat at a joint is a fire path, not a fault path.<\/p>\n<p>This checklist is what we recommend to site engineers maintaining low-voltage busway (250 A\u20136300 A) to IEC 61439-6 \/ GB\/T 7251.6. It is organised as eight physical inspection points, each tied to a specific failure mode, plus the interval table and the acceptance values we use in our own pre-energisation testing.<\/p>\n<p>If you maintain one thing from this article: <strong>the joint bolts and the joint temperature<\/strong>. Every other failure mode either starts there or shows up there first.<\/p>\n<hr \/>\n<h2>The short answer<\/h2>\n<table>\n<thead>\n<tr>\n<th>Question<\/th>\n<th>Answer<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>How often should low-voltage busway be inspected?<\/td>\n<td><strong>Joint bolt torque at 3 months after commissioning, then a comprehensive inspection at least annually.<\/strong> High-load, high-vibration or corrosive sites: every 6 months.<\/td>\n<\/tr>\n<tr>\n<td>When should thermographic scanning be done?<\/td>\n<td>Annually at minimum; <strong>under at least 40% load<\/strong>, otherwise the reading is meaningless.<\/td>\n<\/tr>\n<tr>\n<td>What is the acceptable temperature rise?<\/td>\n<td>The design limit for our compact busway is <strong>\u226470 K<\/strong> above ambient. A joint running more than 10\u201315 K hotter than its neighbours is a defect even if it is under the limit.<\/td>\n<\/tr>\n<tr>\n<td>What insulation resistance passes?<\/td>\n<td><strong>\u226520 M\u03a9 at 500\/1000 V<\/strong> for a dry system. In humid conditions the pre-energisation floor is <strong>0.4 M\u03a9<\/strong> \u2014 below that, do not energise.<\/td>\n<\/tr>\n<tr>\n<td>Can maintenance be done live?<\/td>\n<td><strong>No.<\/strong> Isolate before any inspection, torque check, or cleaning.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>1. Joint bolt torque<\/h2>\n<p>Bolted joints are the highest-resistance point in any busway run, and contact resistance rises as torque relaxes. Thermal cycling is what relaxes it: every load cycle expands and contracts the conductors, and over months the Belleville washers lose preload.<\/p>\n<p><strong>What to do:<\/strong> re-torque every joint after the first three months of operation, then annually.<\/p>\n<p><strong>Acceptance values (our standard hardware):<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Bolt<\/th>\n<th>Torque<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>M8<\/td>\n<td>22\u201330 N\u00b7m<\/td>\n<\/tr>\n<tr>\n<td>M10<\/td>\n<td>45\u201359 N\u00b7m<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>What goes wrong if you skip it:<\/strong> contact resistance climbs, the joint runs hot, the insulation at the joint ages faster, and eventually you get arcing inside an enclosure nobody opens. Most busway failures we are asked to diagnose start as a loose joint found two years too late.<\/p>\n<p><strong>Method note \u2014 two bolt types, two procedures:<\/strong> our standard hardware uses <strong>shear-head bolts<\/strong>, where the correct torque is reached when the head shears off. There is nothing to measure, and an impact driver will simply snap it early at the wrong value. For hex-head bolts, use a calibrated torque wrench. In both cases, replace any washer that is fully compressed \u2014 a flattened washer has already lost its spring and is no longer holding preload.<\/p>\n<hr \/>\n<h2>2. Thermographic (IR) scan under load<\/h2>\n<p>This is the single most useful diagnostic you can run, and the one most often done wrong. A thermal scan of an unloaded busway tells you nothing \u2014 joints only reveal themselves when current is flowing.<\/p>\n<p><strong>Do it under load.<\/strong> At least 40% of rated current; 60\u201380% is better.<\/p>\n<p><strong>Scan these four locations, in this order:<\/strong><\/p>\n<ol>\n<li>Every joint (the bolted connection between two sections)<\/li>\n<li>Every tap-off box connection point<\/li>\n<li>The feed-in box and the connection to the transformer or switchgear<\/li>\n<li>The busway body itself, looking for a hot section that indicates internal conductor or insulation damage<\/li>\n<\/ol>\n<p><strong>How to read it:<\/strong> absolute temperature matters less than <strong>delta between comparable points<\/strong>. Compare phase-to-phase at the same joint, and joint-to-joint along the same run. A joint 10\u201315 K hotter than its neighbours is a defect even when it is below the 70 K design rise, because it is on a trajectory.<\/p>\n<p><strong>Document it:<\/strong> photograph every joint with its reference number. Year-over-year comparison of the same joint is worth more than any single reading.<\/p>\n<p><strong>Recommended clearance for scanning:<\/strong> at least 1.0 m in front of the busway for a clear line of sight. Data halls and dense riser shafts need the shaft width planned for this \u2014 it is much cheaper to design in than to retrofit.<\/p>\n<hr \/>\n<h2>3. Temperature rise against the design limit<\/h2>\n<p>Our compact busway is rated for <strong>\u226470 K temperature rise<\/strong> at rated current. That is the design envelope, not a target.<\/p>\n<p><strong>Three things to check:<\/strong><\/p>\n<ul>\n<li><strong>Absolute rise<\/strong> at rated load must stay under the design value.<\/li>\n<li><strong>Balance across phases<\/strong> \u2014 a persistent imbalance points to a connection problem, not a load problem.<\/li>\n<li><strong>Trend over time<\/strong> at the same joint and the same load. A joint that has risen 8 K over two years is failing, even at 55 K.<\/li>\n<\/ul>\n<p>If a joint exceeds the limit: isolate, inspect the contact surfaces for oxidation and pitting, replace the <a href=\"\/products\/joint-pack\/\">joint pack<\/a> if the plating is damaged, and re-torque to specification. Do not simply clean and re-tighten a joint whose plating is gone \u2014 the resistance will come back.<\/p>\n<hr \/>\n<h2>4. Insulation resistance<\/h2>\n<p>Measure phase-to-phase and phase-to-earth before every re-energisation after work, and annually as part of the routine inspection.<\/p>\n<p><strong>Acceptance:<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Condition<\/th>\n<th>Minimum<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Dry, normal installation<\/td>\n<td><strong>\u226520 M\u03a9<\/strong> at 500 V or 1000 V<\/td>\n<\/tr>\n<tr>\n<td>Humid environment, before energising<\/td>\n<td><strong>\u22650.4 M\u03a9<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Below 0.4 M\u03a9<\/td>\n<td><strong>Do not energise.<\/strong> Dry out and investigate.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Why the two numbers:<\/strong> 20 M\u03a9 is the acceptance value for a healthy dry system. 0.4 M\u03a9 is the floor below which we will not permit energisation in a humid environment \u2014 it is a safety gate, not a pass mark. A system sitting at 0.8 M\u03a9 is energisable but is telling you moisture is inside the enclosure, and you should find out why before it becomes a flashover.<\/p>\n<p><strong>Common cause of a sudden drop:<\/strong> a joint cover left off during construction, condensate from a cold shaft, or wash-down water entering a tap-off box whose gasket was not reseated.<\/p>\n<hr \/>\n<h2>5. Protective earth continuity<\/h2>\n<p><strong>Acceptance:<\/strong> <strong>PE continuity &lt; 0.1 \u03a9<\/strong> end to end.<\/p>\n<p>This is the check that protects people, and it is the one most often skipped because the system \"works\". A busway with a good phase path and a poor earth path will run perfectly until the day a fault occurs, and then the fault current takes a path you did not design.<\/p>\n<p>Test from the feed-in earth bar to the furthest enclosure earth point. If it fails, look for: a joint where the earth bar was not bolted, paint or oxidation under a bonding point, or a section installed with the wrong earth kit.<\/p>\n<hr \/>\n<h2>6. Tap-off boxes and plug-in units<\/h2>\n<p>Tap-off points are where the system is touched most often, and therefore where mechanical damage concentrates.<\/p>\n<p><strong>Check each unit for:<\/strong><\/p>\n<ul>\n<li><strong>Mechanical interlock function<\/strong> \u2014 the unit must not be insertable or removable under load. Test it physically, not by reading the label.<\/li>\n<li><strong>Contact fingers<\/strong> \u2014 look for pitting, discolouration, or loss of spring tension. Discoloured fingers mean the unit has been making or breaking under load, which it is not designed to do.<\/li>\n<li><strong>Gasket and IP integrity<\/strong> \u2014 a hardened or missing gasket turns an IP65 unit into an IP20 hole in a wash-down area.<\/li>\n<li><strong>Cable termination torque<\/strong> at the outgoing terminals.<\/li>\n<li><strong>Labelling<\/strong> \u2014 circuit identification that matches the single-line diagram. Misidentified tap-offs are a recurring cause of maintenance work on the wrong circuit.<\/li>\n<\/ul>\n<p><strong>Fails the inspection if:<\/strong> the interlock can be defeated by hand, a contact finger is discoloured or blackened, a gasket is hardened, cracked or missing, the outgoing termination has been re-made without a torque figure on the record, or the label does not match the single-line diagram.<\/p>\n<p><strong>Action:<\/strong> take the unit out of service, replace the contact assembly rather than cleaning it \u2014 a finger that has discoloured has already lost its spring temper \u2014 fit a new gasket, and re-label from the drawing. A tap-off that has arced once will arc again; the second arc is the one that opens a phase under load.<\/p>\n<hr \/>\n<h2>7. Enclosure, environment and ingress protection<\/h2>\n<p>Busway is a sealed system only for as long as its seals survive. Walk the route and look for:<\/p>\n<table>\n<thead>\n<tr>\n<th>Finding<\/th>\n<th>What it means<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Dust accumulation on the enclosure<\/td>\n<td>In a data hall or industrial plant, dust plus humidity is a tracking path. Clean, then find the source.<\/td>\n<\/tr>\n<tr>\n<td>Water staining or rust at a joint<\/td>\n<td>The gasket has failed or the joint was assembled wet.<\/td>\n<\/tr>\n<tr>\n<td>Deformation or dented sections<\/td>\n<td>A lifted or dropped section. Check insulation resistance at that joint specifically.<\/td>\n<\/tr>\n<tr>\n<td>Corrosion in a chemical or coastal environment<\/td>\n<td>The enclosure coating has been breached. This is a replacement decision, not a cleaning one.<\/td>\n<\/tr>\n<tr>\n<td>Vegetation, stored material, or cables resting on the busway<\/td>\n<td>Mechanical load and a fire path. Clear it.<\/td>\n<\/tr>\n<tr>\n<td>Missing joint covers or inspection plates<\/td>\n<td>The system is no longer IP-rated at that point.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Clearances to maintain<\/strong> (per installation standards): front clearance <strong>0.6 m for LV, 0.9 m for MV<\/strong>; <strong>0.3 m above<\/strong>; <strong>0.2 m to the side<\/strong>. If stored goods have encroached on these, the system is no longer maintainable \u2014 and in most jurisdictions no longer compliant.<\/p>\n<hr \/>\n<h2>8. Supports, hangers and structural movement<\/h2>\n<p>Busway is heavy and it moves. Supports carry the weight; joints carry the current. When supports fail, the joints take the load, and joint failure follows.<\/p>\n<p><strong>Check:<\/strong><\/p>\n<ul>\n<li>Hanger and bracket fixings for looseness or pull-out<\/li>\n<li>Spacing against the installation drawing, especially after any building modification<\/li>\n<li>Straightness and level along the run \u2014 a sagging span loads the adjacent joints<\/li>\n<li><strong>Expansion provision<\/strong> \u2014 long runs need to move thermally. A run installed hard against both ends will buckle or load its joints.<\/li>\n<li>Riser shafts in high-rise buildings: check the spring hangers and the floor penetration fire seals at the same time. Firestopping that has been cut to run a new cable is no longer firestopping.<\/li>\n<\/ul>\n<p><strong>Fails the inspection if:<\/strong> any hanger or bracket is loose, a fixing has pulled out of the slab, support spacing no longer matches the installation drawing, the run has visibly sagged between two supports, expansion provision is absent on a long run, or a penetration seal has been cut and not restored.<\/p>\n<p><strong>Action:<\/strong> re-fix and re-level before anything is re-torqued. A run that has been carrying its own weight through the joints has to have those joints opened and inspected, not simply tightened \u2014 the contact surfaces have already moved against each other. Restore firestopping with a tested seal and log the penetration; a seal cut for a new cable is a compliance failure on its own.<\/p>\n<hr \/>\n<h2>Interval table<\/h2>\n<table>\n<thead>\n<tr>\n<th>Interval<\/th>\n<th>Actions<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>3 months after commissioning<\/strong><\/td>\n<td>Re-torque all joint bolts. Baseline IR scan under load, photographed and recorded.<\/td>\n<\/tr>\n<tr>\n<td><strong>Every 6 months<\/strong> (high-load, high-vibration, corrosive, or wash-down sites)<\/td>\n<td>IR scan + tap-off unit inspection + enclosure walk-down<\/td>\n<\/tr>\n<tr>\n<td><strong>Annually<\/strong> (all sites)<\/td>\n<td>Full 8-point inspection: torque, IR scan, temperature rise, insulation resistance, PE continuity, tap-off units, enclosure, supports<\/td>\n<\/tr>\n<tr>\n<td><strong>After any work on the system<\/strong><\/td>\n<td>Insulation resistance + PE continuity before re-energisation. Never energise on the assumption that it was fine before.<\/td>\n<\/tr>\n<tr>\n<td><strong>After any fault, trip, or reported odour\/noise<\/strong><\/td>\n<td>Isolate immediately, then full inspection of the affected section<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<hr \/>\n<h2>Safety rules that are not negotiable<\/h2>\n<ol>\n<li><strong>Isolate before inspection.<\/strong> No torque check, cleaning, or visual inspection inside a joint cover on a live system.<\/li>\n<li><strong>Never stand, sit, walk, or place material on busway.<\/strong> It is not a cable tray and it is not a walkway.<\/li>\n<li><strong>Keep water, concrete dust, and metal particles out.<\/strong> A single screw left inside an enclosure will find a phase.<\/li>\n<li><strong>Do not energise a system below 0.4 M\u03a9<\/strong> in humid conditions.<\/li>\n<li><strong>A joint that is hot, noisy, or smells must be de-energised before you investigate it.<\/strong> Smell means insulation is already decomposing.<\/li>\n<\/ol>\n<hr \/>\n<h2>What \"extending service life\" actually means<\/h2>\n<p>Most of the advice about extending busway life is really about <strong>not creating new failure modes<\/strong>. In practice, three things do most of the work:<\/p>\n<ol>\n<li><strong>Keep the joints at the specified torque.<\/strong> Every other degradation path accelerates from a loose joint.<\/li>\n<li><strong>Keep the enclosure sealed.<\/strong> Water and dust are the two things that turn a 30-year asset into a 12-year one.<\/li>\n<li><strong>Keep the load within rating and balanced.<\/strong> Sustained overload does not fail a busway immediately; it ages the insulation at every joint simultaneously, and then it fails in several places at once.<\/li>\n<\/ol>\n<p>A busway that is torqued, scanned, sealed, and run within rating will outlive most of the equipment it connects.<\/p>\n<hr \/>\n<h2>FAQ<\/h2>\n<p><strong>How often should a bus duct system be inspected?<\/strong><br \/>\nJoint bolt torque at three months after commissioning, then a comprehensive inspection at least once a year. Sites with high load, vibration, corrosive atmosphere, or wash-down should inspect every six months.<\/p>\n<p><strong>Can bus duct maintenance be performed while energised?<\/strong><br \/>\nNo. All inspection, torque checking, cleaning, and joint work requires isolation. The only live activity is thermographic scanning, which is done from a safe distance without opening any enclosure.<\/p>\n<p><strong>What causes bus duct overheating?<\/strong><br \/>\nIn order of frequency: loose joint bolts (raised contact resistance), oxidized or pitted contact surfaces, overload beyond rated current, a failed tap-off unit drawing more than its rating, and obstructed ventilation in compact busway. A joint that is 10\u201315 K hotter than its neighbours is the earliest detectable sign.<\/p>\n<p><strong>What insulation resistance is acceptable for busway?<\/strong><br \/>\n20 M\u03a9 or higher at 500\/1000 V for a dry system. In humid conditions, 0.4 M\u03a9 is the minimum for energisation \u2014 below that, do not energise the system.<\/p>\n<p><strong>How do you extend the service life of a bus duct?<\/strong><br \/>\nThree things: keep joint bolts at specified torque (M8 22\u201330 N\u00b7m, M10 45\u201359 N\u00b7m), keep the enclosure sealed against water and dust, and keep the load within the rating and balanced across phases. Annual thermographic scanning under load catches the rest early.<\/p>\n<p><strong>What is the torque value for busway joint bolts?<\/strong><br \/>\nM8 bolts: 22\u201330 N\u00b7m. M10 bolts: 45\u201359 N\u00b7m. Our standard hardware uses shear-head bolts \u2014 torque until the head shears off. For hex-head bolts, use a calibrated torque wrench. Replace any washer that is fully compressed.<\/p>\n<p><strong>How do I know if a hot joint is a real problem?<\/strong><br \/>\nCompare it to its neighbours under load. A joint 10\u201315 K hotter than comparable joints on the same run is a defect even when it is below the 70 K design limit. Trend it year over year \u2014 a joint climbing 8 K in two years is failing.<\/p>\n<p><strong>Does bus duct need maintenance if it is never touched?<\/strong><br \/>\nYes. Untouched does not mean unchanged: thermal cycling relaxes joint bolts, gaskets age, and dust accumulates. The systems that fail are usually the ones nobody opened for five years.<\/p>\n<hr \/>\n<h2>Related reading<\/h2>\n<ul>\n<li><a href=\"\/busway-installation-guide\/\">Busway Installation Guide: Safety, Handling, Storage and Commissioning<\/a> \u2014 the pre-energisation checks and installation tolerances this checklist assumes<\/li>\n<li><a href=\"\/standards-compliance\/\">Standards &amp; Compliance<\/a> \u2014 IEC 61439-6 vs UL 857, firestopping methods, and the five mandatory pre-energisation tests<\/li>\n<li><a href=\"\/technical-specifications\/\">Technical Specifications<\/a> \u2014 rated current, temperature rise, short-circuit withstand, and IP ratings by product family<\/li>\n<li><a href=\"\/products\/compact-busway\/\">Compact Busway<\/a> \u2014 250 A\u20136300 A, IP54\u2013IP68, \u226422.8 kg\/m<\/li>\n<li><a href=\"\/products\/tap-off-box\/\">Tap-off Box<\/a> \u2014 63\u2013400 A plug-in units with mechanical interlock<\/li>\n<\/ul>\n<hr \/>\n<p><em>Guangdong Yuebiao Electric Co., Ltd. manufactures low-voltage and medium-voltage busway, distribution boxes, and switchgear to IEC 61439-1\/-2\/-6 and GB\/T 7251. Type-tested, CQC certified (No. CQC22107339892), ISO 9001:2015. For maintenance support or a replacement joint kit, contact sales@yuebiao.ltd.<\/em><\/p>\n<p><script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"How often should a bus duct system be inspected?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Joint bolt torque at three months after commissioning, then a comprehensive inspection at least once a year. Sites with high load, vibration, corrosive atmosphere, or wash-down should inspect every six months.\"}},{\"@type\":\"Question\",\"name\":\"Can bus duct maintenance be performed while energised?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. All inspection, torque checking, cleaning, and joint work requires isolation. The only live activity is thermographic scanning, which is done from a safe distance without opening any enclosure.\"}},{\"@type\":\"Question\",\"name\":\"What causes bus duct overheating?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"In order of frequency: loose joint bolts (raised contact resistance), oxidized or pitted contact surfaces, overload beyond rated current, a failed tap-off unit drawing more than its rating, and obstructed ventilation in compact busway. A joint that is 10\u201315 K hotter than its neighbours is the earliest detectable sign.\"}},{\"@type\":\"Question\",\"name\":\"What insulation resistance is acceptable for busway?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"20 M\u03a9 or higher at 500\/1000 V for a dry system. In humid conditions, 0.4 M\u03a9 is the minimum for energisation \u2014 below that, do not energise the system.\"}},{\"@type\":\"Question\",\"name\":\"How do you extend the service life of a bus duct?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Three things: keep joint bolts at specified torque (M8 22\u201330 N\u00b7m, M10 45\u201359 N\u00b7m), keep the enclosure sealed against water and dust, and keep the load within the rating and balanced across phases. Annual thermographic scanning under load catches the rest early.\"}},{\"@type\":\"Question\",\"name\":\"What is the torque value for busway joint bolts?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"M8 bolts: 22\u201330 N\u00b7m. M10 bolts: 45\u201359 N\u00b7m. Our standard hardware uses shear-head bolts \u2014 torque until the head shears off. For hex-head bolts, use a calibrated torque wrench. Replace any washer that is fully compressed.\"}},{\"@type\":\"Question\",\"name\":\"How do I know if a hot joint is a real problem?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Compare it to its neighbours under load. A joint 10\u201315 K hotter than comparable joints on the same run is a defect even when it is below the 70 K design limit. Trend it year over year \u2014 a joint climbing 8 K in two years is failing.\"}},{\"@type\":\"Question\",\"name\":\"Does bus duct need maintenance if it is never touched?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Untouched does not mean unchanged: thermal cycling relaxes joint bolts, gaskets age, and dust accumulates. The systems that fail are usually the ones nobody opened for five years.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A field checklist for maintaining low-voltage busway: joint torque, IR scanning under load, temperature rise, insulation resistance, PE continuity, tap-off units, enclosure and supports.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"seo_description":"","seo_keywords":""},"categories":[7],"tags":[159,151,155,158,156,157],"class_list":["post-443","post","type-post","status-publish","format-standard","hentry","category-blog","tag-bus-duct-inspection","tag-bus-duct-maintenance","tag-busway-maintenance","tag-insulation-resistance","tag-preventive-maintenance","tag-thermal-imaging"],"_links":{"self":[{"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/posts\/443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/comments?post=443"}],"version-history":[{"count":0,"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/posts\/443\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/media?parent=443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/categories?post=443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.busductfactory.com\/vi\/wp-json\/wp\/v2\/tags?post=443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}